Decreased tool lead time by 10 months
Lowered non-recurring tooling costs by over $8.0M
Lowered recurring costs by over $10.0M since installation
Achieved final part accuracy of ±0.010-0.015" (from ±0.050")
Saved facility space 30,000 SF
Increased machine utilization time 200%
Project duration from concept to production was 16 months (compared to 30 months with traditional tooling system)
Reusable on future programs
No part rejections due to tooling